4.7 Article

Multi-criteria selection for a wind observation station location using analytic hierarchy process

Journal

RENEWABLE ENERGY
Volume 29, Issue 8, Pages 1383-1392

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2003.12.020

Keywords

wind-speed observation station; AHP; location selection

Ask authors/readers for more resources

Projecting wind-power plants depends on the amount of the power that the plant can support. The location chosen for the project needs to be evaluated in consideration of different criteria when determining the potentiality of the wind-power. Measuring the wind-speed and the wind-path through equipment in prospective wind observation station play an important role in such later stages as evaluation of data, determination of the amount of energy and choosing the wind tribune. In this study, the aim was to determine the most convenient location for a wind observation station to be built on the campus of a university using analytic hierarchy process (AHP). (C) 2004 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available