4.4 Article Proceedings Paper

Renovation of epithermal neutron beam for BNCT at THOR

Journal

APPLIED RADIATION AND ISOTOPES
Volume 61, Issue 5, Pages 1039-1043

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.apradiso.2004.05.042

Keywords

epithermal neutron beam design; THOR; renovation

Ask authors/readers for more resources

Heading for possible use for clinical trial, THOR (Tsing Hua Open-pool Reactor) at Taiwan was shutdown for renovation of a new epithermal neutron beam in January 2003. In November 2003, concrete cutting was finished for closer distance from core and larger treatment room. This article presents the design base that the construction of the new beam is based on. The filter/moderator design along the beam is Cd(0.1 cm) + Al(10 cm) + FLUENTAL(TM)(16 cm) + Al(10 cm) + FLUENTAL(24 cm) + Void(18 cm) + Cd(0.1 cm) + Bi(10 cm) with 6 cm Pb as reflector. Following the filter/moderator is an 88 cm long, 6 cm thick Bi-lined collimator with Li2CO3-PE at the end. The collimator is surrounded by Li2CO3-PE and Pb. The calculated beam parameters under 2 MW at the beam exit is phi(epi) = 3.4 x 10(9) n/cm(2)/s, D-f/phi(epi) = 2.8 x 10(-11) cGy cm(2)/n, D-gamma/phi(epi) = 1.3 x 10(-11) cGy cm(2)/n, and J(+)/phi = 0.8. For a phantom placed 10 cm from beam exit, MCNP calculation shows that the advantage depth is 8.9 cm, and advantage ratio is 5.6 if boron concentration in tumor and normal tissue are assumed to be 65 and 18 ppm. The maximum dose rate for normal tissue is 50 cGy/min. The maximum therapeutic ratio is 6. The construction of the beam is scheduled to be finished by the end of April 2004. (C) 2004 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available