3.8 Article

Risk concession model for build/operate/transfer contract projects

Journal

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2005)131:2(211)

Keywords

-

Ask authors/readers for more resources

This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to establishing a risk concession model for BOT contract projects. The decision for a concession period is one of the most important decisions in determining a BOT contract. BOTCcM presents an alternative method to assist in determining a concession period that can protect the basic interests of both the investor and the government concerned. However, there is a major limitation in using the model, namely it gives no consideration to the impacts of risks on the estimation of various economic variables in the model. This study, considers the risk impacts to the BOTCcM model and presents all additional risk concession model. This model provides an approach for formulating a concession period to consider the impacts of risks and, at the same time, protect the basic interests of both the investor and the government concerned. A hypothetical case is used to show the procedures of formulating the risk concession period through the assistance of the Monte Carlo simulation method.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available