4.7 Article

Maintenance of the undersea section of the Seikan Tunnel

Journal

TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
Volume 20, Issue 2, Pages 143-149

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2003.10.001

Keywords

tunnel maintenance; long-term monitoring; water inflow; convergence measure

Ask authors/readers for more resources

This paper introduces the results of measurements made over a period of 14 years after the Seikan Tunnel was opened for service. Because this tunnel is a very long undersea tunnel with the length of 54 km, the necessity of clarifying the long-term behavior of the tunnel structure was recognized from the start. Various measurements are made to survey the condition of the ground and lining concrete and data thus obtained are used to assess the soundness of the tunnel structure. Judging from the data thus far obtained, the tunnel structure appears to remain in a good condition. (C) 2003 Elsevier Ltd. All rights reserved..

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available