4.1 Article

A note on scheduling deteriorating jobs

Journal

MATHEMATICAL AND COMPUTER MODELLING
Volume 41, Issue 8-9, Pages 883-886

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.mcm.2004.09.004

Keywords

scheduling; single-machine; flow-time; deterioration

Ask authors/readers for more resources

In scheduling environments with deterioration, jobs processed later in the sequence require more time. In this note, we study a scheduling problem in which the processing time of a job is an increasing function of its position in the sequence (rather than its starting time, as assumed in previous studies). We study a flow-time minimization problem on a single machine, with exponential deterioration function. We show that an optimal schedule is V-shaped with respect to job processing times. (c) 2005 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.1
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available