4.8 Article

Applicability of multicriteria decision aid to sustainable hydropower

Journal

APPLIED ENERGY
Volume 101, Issue -, Pages 261-267

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2012.05.024

Keywords

Multicriteria decision aid; VIKOR method; Hydropower; Renewable energy sources directive; Water framework directive

Ask authors/readers for more resources

EU directives RESD (2001/77/EC) and WFD (2000/60/EC) can be considered as partially conflicting. Achieving a good qualitative and quantitative status of waters, what presumes non-deterioration principle of the existing ecological status in line with WFD, is conflicting with the construction of new hydropower plants that are promoting renewable energies, what is in line with RESD. Several projects have been developed in order to minimize conflicts between the two Directives, often providing a list of key criteria to be taken into consideration when deciding on the impact minimization of new ones or certification to existing plants. One example is CH2OICE, aiming at developing a technically and economically feasible certification procedure for hydropower generation facilities of high environmental standard. This paper aims to evaluate applicability of multicriteria decision aid to decision makers during the design process, decisions on site selection and plant technical and operational parameters, based on both economic and environmental criteria selected. (C) 2012 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available