Journal
AUTOMATION IN CONSTRUCTION
Volume 14, Issue 3, Pages 369-381Publisher
ELSEVIER
DOI: 10.1016/j.autcon.2004.08.011
Keywords
site layout; 3D model; 4D CAD; construction management
Ask authors/readers for more resources
Construction schedules and site space arrangement are essential to project management, as they directly influence security, machine running, material deployment, power distribution as well as construction progress and cost. There has been a strong need for more effective planning and management of site space and facilities. This paper introduces a 4D Integrated Site Planning System (4D-ISPS) which integrates schedules, 3D models, resources and site spaces together with 4D CAD technology to provide 4D graphical visualization capability for construction site planning. The features of 4D-ISPS are described in detail. The implementation techniques of this system are also discussed and a real life case is presented. (C) 2004 Elsevier B.V. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available