4.6 Article

Phasor measurement unit placement techniques for complete and incomplete observability

Journal

IEEE TRANSACTIONS ON POWER DELIVERY
Volume 20, Issue 4, Pages 2381-2388

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRD.2005.855457

Keywords

observability; phasor measurement units; simulated annealing; trees (graphs)

Ask authors/readers for more resources

This paper presents techniques for identifying placement sites for phasor measurement units (PNWs) in a power system based on incomplete observability. The novel concept of depth of unobservability is introduced and its impact on the number of PMU placements is explained. Initially, we make use of spanning trees of the power system graph and a tree search technique to find the optimal location of PMUs. We then extend the modeling to recognize limitations in the availability of communication facilities around the network and pose the constrained placement problem within the framework of Simulated Annealing (SA). The SA formulation was further extended to solve the pragmatic phased installation of PMUs. The performance of these methods is tested on two electric utility systems and IEEE test systems. Results show that these techniques provide utilities with systematic approaches for incrementally placing PMUs thereby cushioning their cost impact.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available