4.6 Article

Post-disaster multi-period road network repair: work scheduling and relief logistics optimization

Journal

ANNALS OF OPERATIONS RESEARCH
Volume 283, Issue 1-2, Pages 1345-1385

Publisher

SPRINGER
DOI: 10.1007/s10479-018-3037-2

Keywords

Natural disasters; Road network repair work scheduling; Relief logistics; Bi-level programming; Maximum relative satisfaction degree; Steady-state parallel genetic algorithm; Wenchuan earthquake

Funding

  1. National Natural Science Foundation of China [71502059]
  2. Hunan Provincial Natural Science Foundation of China [2016JJ3091]
  3. Educational Department of Hunan Province of China [16B169]
  4. China Scholarship Council [201706725018]
  5. Australian Government
  6. Government of Western Australia
  7. Laboratory High-Performance Computing and Stochastic Information Processing (HPCSIP) of Hunan Normal University, Changsha, China

Ask authors/readers for more resources

We develop a multi-period bi-level programming model for the post-disaster road network repair work scheduling and relief logistics problem. A maximum relative satisfaction degree-based steady-state parallel genetic algorithm is designed to solve this model. In order to validate and test the effectiveness of the presented mathematical model and method, we use a network generator to create numerical examples with different scales and characteristics of road network. Our numerical analysis of the solutions shows that the proposed mathematical model and method can effectively assist the decision-makers to deal with the road network repair work scheduling and relief logistics optimization problem during the emergency response phase. This mathematical model and the approach being developed are applied to deal with the case of Wenchuan earthquake in China. The results show that the required CPU time is short enough such that it meets the time limitation in the emergency response phase, and the strategy of road network repair scheduling will allow repair of the damaged roads to be completed before the end of the planning time horizon by 14.93%. Furthermore, the strategy of relief logistics can provide an efficient relief allocation and transportation path.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available