4.6 Article

Flow shop scheduling with peak power consumption constraints

Journal

ANNALS OF OPERATIONS RESEARCH
Volume 206, Issue 1, Pages 115-145

Publisher

SPRINGER
DOI: 10.1007/s10479-012-1294-z

Keywords

Scheduling; Flow shop; Energy; Peak power consumption; Integer programming; Combinatorial optimization

Ask authors/readers for more resources

We study scheduling as a means to address the increasing energy concerns in manufacturing enterprises. In particular, we consider a flow shop scheduling problem with a restriction on peak power consumption, in addition to the traditional time-based objectives. We investigate both mathematical programming and combinatorial approaches to this scheduling problem, and test our approaches with instances arising from the manufacturing of cast iron plates.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available