4.7 Article

Prediction of tunnel lining loads using correction factors

Journal

ENGINEERING GEOLOGY
Volume 85, Issue 3-4, Pages 302-312

Publisher

ELSEVIER
DOI: 10.1016/j.enggeo.2006.03.001

Keywords

tunnel lining loads; support delay factor; yield factor; prediction of lining loads; field measurements

Ask authors/readers for more resources

A design method for the prediction of lining loads should include the decrease of lining loads due to the stress release before lining installation and the increase of lining loads due to development of ground yielding. Schwartz and Einstein included both factors in their original closed form solutions in the form of a support delay factor lambda(d) and a yield factor lambda(y) respectively. The validity of the design method is reviewed by comparing the loads calculated using the methods with the field measurements obtained from several tunnels. The possible causes of the load discrepancy between measurements and predictions are presented. Schwartz and Einstein's proposed method gives reasonable results for tunnels with short delay lengths. However, the method could not be used reliably for tunnels either with long delay lengths or with voids between the soil and TBM due to the difficulties finding the pre-support ground movements and therefore lambda(d). (c) 2006 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available