4.6 Article

Simultaneous cyclic scheduling and control of a multiproduct CSTR

Journal

INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH
Volume 45, Issue 20, Pages 6698-6712

Publisher

AMER CHEMICAL SOC
DOI: 10.1021/ie051293d

Keywords

-

Ask authors/readers for more resources

In this work, we propose a simultaneous scheduling and control formulation by explicitly incorporating into the scheduling model process dynamics in the form of differential/algebraic constraints. The formulation takes into account the interactions between scheduling and control and is able to handle nonlinearities embedded into the processing system. The simultaneous scheduling and control problems is cast as a mixed-integer dynamic optimization (MIDO) problem where the simultaneous approach, based on orthogonal collocation on finite elements, is used to transform it into a mixed-integer nonlinear programming (MINLP) problem. The proposed simultaneous scheduling and control formulation is tested using three multiproduct continuous stirred tank reactors featuring difficult nonlinearities.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available