Journal
APPLIED THERMAL ENGINEERING
Volume 26, Issue 14-15, Pages 1437-1447Publisher
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.applthermaleng.2006.01.020
Keywords
trigeneration; airport; optimization; management; energy saving
Ask authors/readers for more resources
With reference to the feasibility analysis for CHCP applications in airports performed in Part I of this work, the optimal strategy for repowering and operation of the Malpensa 2000 CHCP plant is here discussed. The analysis starts from experimental energy demand data, available on hourly basis for an entire operational year. After a description of the CHCP lay-out, the optimal management strategy was determined keeping into account the articulated energy tariff system and the technical characteristics of components. A profit-oriented optimization of the repowering actions to take up to 2010 is presented, based on the expected growth of energy consumption due to the scheduled increases in transportation capacity; energy and emission saving were also calculated by simulating plant operation on hourly basis, for several repowering strategies. (c) 2006 Elsevier Ltd. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available