4.7 Article

On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out

Journal

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Volume 174, Issue 1, Pages 182-200

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2005.02.043

Keywords

maintenance; spare parts; repair capacity; priority setting; k-out-of-N systems; ageing

Ask authors/readers for more resources

In this paper we consider a k-out-of-N system with identical, repairable components under a condition-based maintenance policy. Maintenance consists of replacing all failed and/or aged components. Next, the replaced components have to be repaired. The system availability can be controlled by the maintenance policy, the spare part inventory level, the repair capacity and repair job priority setting. We present two approximate methods to analyse the relation between these control variables and the system availability. Comparison with simulation results shows that we can generate accurate approximations using one of these models, depending on the system size. (c) 2005 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available