Journal
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH
Volume 24, Issue 1, Pages 125-145Publisher
WORLD SCIENTIFIC PUBL CO PTE LTD
DOI: 10.1142/S0217595907001127
Keywords
integrated deteriorating model; JIT delivery; production and inventory; flexibility; inspection
Categories
Ask authors/readers for more resources
This study develops an integrated deteriorating inventory policy for a single-buyersingle-supplier model with multiple JIT deliveries considering the transportation cost, inspection cost and the cost of less flexibility. Distinct from the former concept of average inventory level, our paper proposes a significantly different approach to deal with the first production batch and uses a revised method to approximate the relationship between the supplier's production time and the storage time. We provide a rigorous analysis to derive the number of inspection and deliveries, the optimal cycle time of deliveries, and the delivery size for the replenishment policy of the integrated buyer-supplier inventory deteriorating model. It is shown that the unit inspection cost is one of the critical factors affecting the deteriorating inventory model. A numerical example is presented to illustrate the theory.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available