Transmission congestion and competition on power generation expansion

Journal

IEEE TRANSACTIONS ON POWER SYSTEMS
Volume 22, Issue 1, Pages 156-163

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2006.887960

Keywords

Cournot competition; power generation expansion; transmission congestion; transmission constraints

Ask authors/readers for more resources

Generation expansion planning involves decisions on location and capacity of new generation, which may lead to adding or relieving congestion in transmission lines and to increasing or reducing competition in deregulated markets. Generation expansion may encounter congestion in the transmission network by constrained single-line flows,as well as flowgate transfer capabilities. In this paper, a model to study the interaction between competition and transmission congestion on power generation expansion is proposed. The generation expansion problem is modeled as a Cournot competition game. Network transmission constraints are included in the optimal generation expansion problem to comply with power flow limits. Results from a five-bus power network and the IEEE 24-bus system are presented and discussed.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available