4.6 Article

Project delivery system selection under uncertainty: Multicriteria multilevel decision aid model

Journal

JOURNAL OF MANAGEMENT IN ENGINEERING
Volume 23, Issue 4, Pages 200-206

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0742-597X(2007)23:4(200)

Keywords

-

Ask authors/readers for more resources

Selecting an optimal project delivery system is a critical task that owners should do to ensure project success. This selection is a complex decision-making process. The complexity arises from the uncertain or not well-defined parameters and/or the multiple criteria structure of such decisions. In this study, a decision aid model using the analytical hierarchy process (AHP) coupled with rough approximation concepts is developed to assist the owners. The selection criteria are determined by studying a number of benchmarks. The model ranks the alternative delivery systems by considering both benchmark results and owner's opinion. In interval AHP, an optimization procedure is performed via obtaining the upper and the lower linear programming models to determine the interval priorities for alternative project delivery systems. In cases having incomparable alternatives, which is the most likely case in uncertain decision making, the model uses rough set-based measures to reduce the number of decision criteria to a subset, which is able to fully rank the alternatives. To illustrate the applicability and usefulness of this methodology, a real world case study will be demonstrated.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available