4.3 Article

A tabu search heuristic for the quay crane scheduling problem

Journal

JOURNAL OF SCHEDULING
Volume 10, Issue 4-5, Pages 327-336

Publisher

SPRINGER
DOI: 10.1007/s10951-007-0029-5

Keywords

container terminal; crane scheduling; disjunctive graph; Tabu search

Ask authors/readers for more resources

This paper proposes a tabu search heuristic for the Quay Crane Scheduling Problem (QCSP), the problem of scheduling a fixed number of quay cranes in order to load and unload containers into and from a ship. The optimality criterion considered is the minimum completion time. Precedence and non-simultaneity constraints between tasks are taken into account. The former originate from the different kind of operations that each crane has to perform; the latter are needed in order to avoid interferences between the cranes. The QCSP is decomposed into a routing problem and a scheduling problem. The routing problem is solved by a tabu search heuristic, while a local search technique is used to generate the solution of the scheduling problem. This is done by minimizing the longest path length in a disjunctive graph. The effectiveness of our algorithm is assessed by comparing it to a branch-and-cut algorithm and to a Greedy Randomized Adaptive Search Procedure (GRASP).

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available