Causes of bleeding in a hot-in-place asphalt pavement

Journal

CONSTRUCTION AND BUILDING MATERIALS
Volume 21, Issue 12, Pages 2023-2030

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.conbuildmat.2007.06.008

Keywords

hot-in-place recycling; rehabilitation; overlay; bleeding

Ask authors/readers for more resources

Hot-in-place recycling was used to rehabilitate a section of roadway in State highway. A 25-mm overlay was placed over the recycled layer. Shortly after construction, moderate to severe bleeding was observed in isolated areas throughout the recycled section. This study was carried out to investigate the potential causes of the bleeding of the pavement. The field observation and laboratory tests were conducted. The laboratory tests were performed using core samples taken from the bleeding and non-bleeding areas of the pavement. The test results showed that the bleeding was associated with the surface layer and tack coat. This paper demonstrates that hot-in-place recycling is viable method for correcting distress asphalt pavement. (c) 2007 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available