Journal
IEEE SYSTEMS JOURNAL
Volume 9, Issue 2, Pages 615-628Publisher
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/JSYST.2013.2289771
Keywords
Daily hydrothermal generation scheduling (DHGS); generator and branch outages; load uncertainty; security-constrained unit commitment (SCUC); stochastic programming
Ask authors/readers for more resources
This paper presents the application of a mixed-integer programming (MIP) approach for solving stochastic security-constrained daily hydrothermal generation scheduling (SCDHGS). Power system uncertainties including generating units and branch contingencies and load uncertainty are explicitly considered in the stochastic programming of SCDHGS. The roulette wheel mechanism and lattice Monte Carlo simulation (LMCS) are first employed for random scenario generation wherein the stochastic SCDHGS procedure is converted into its respective deterministic equivalents (scenarios). Then, the generating units are scheduled through MIP over the set of deterministic scenarios for the purpose of minimizing the cost of supplying energy and ancillary services over the optimization horizon (24 h) while satisfying all the operating and network security constraints. To a more realistic modeling of the DHGS problem, in the proposed MIP formulation, the nonlinear valve loading effect, cost, and emission function are modeled in linear form, and prohibited operating zones (POZs) of thermal units are considered. Furthermore, a dynamic ramp rate of thermal units is used, and for the hydro plants, the multiperformance curve with spillage and time delay between reservoirs is considered. To assess the efficiency and powerful performance of the aforementioned method, a typical case study based on the standard IEEE-118 bus system is investigated, and the results are compared to each other in different test systems.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available