3.8 Article

Multivariate Process Control Chart for Controlling the False Discovery Rate

Journal

INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS
Volume 11, Issue 4, Pages 385-389

Publisher

KOREAN INST INDUSTRIAL ENGINEERS
DOI: 10.7232/iems.2012.11.4.385

Keywords

Average Run Length; False Discovery Rate; Multivariate Shewhart Control Chart; p-Value

Funding

  1. National Research Foundation of Korea
  2. Ministry of Education, Science and Technology [2012-0001665]

Ask authors/readers for more resources

With the development of computer storage and the rapidly growing ability to process large amounts of data, the multivariate control charts have received an increasing attention. The existing univariate and multi-variate control charts are a single hypothesis testing approach to process mean or variance by using a single statistic plot. This paper proposes a multiple hypothesis approach to developing a new multivariate control scheme. Plotted Hotelling's T-2 statistics are used for computing the corresponding p-values and the procedure for controlling the false discovery rate in multiple hypothesis testing is applied to the proposed control scheme. Some numerical simulations were carried out to compare the performance of the proposed control scheme with the ordinary multivariate Shewhart chart in terms of the average run length. The results show that the proposed control scheme outperforms the existing multivariate Shewhart chart for all mean shifts

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available