3.8 Proceedings Paper

Status Of ECRH Project On EAST Tokamak

Journal

RADIOFREQUENCY POWER IN PLASMAS
Volume 1580, Issue -, Pages 538-541

Publisher

AMER INST PHYSICS
DOI: 10.1063/1.4864607

Keywords

ECRH; gyrotron; transmission line; steerable launcher

Ask authors/readers for more resources

A 140GHz electron cyclotron resonance heating and current drive (EC H&CD) project for EAST Tokamak is launched in 2011 with a total power of 4MW and pulse length of 100 s. The main objectives of the system are to provide central H&CD, assist start-up and control of MED activities. The system comprises four gyrotrons each with nominal output power of 1MW at 140GHz. The RF power, transmitted through four evacuated corrugated waveguides will be injected into plasma from the low field side (radial port). The front steering equatorial launcher directs the RF beam over +/- 25 degrees toroidally and scans over 38 degrees poloidally. At present, the construction of the first 1MW system is undergoing for the expected campaign in the end of 2013. In this paper, the current status of the development and the design of the 140-GHz ECRH system are presented.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available