4.6 Article

RESEARCH ON ASSEMBLY SEQUENCE PLANNING AND OPTIMIZATION OF PRECAST CONCRETE BUILDINGS

Journal

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Volume 24, Issue 2, Pages 106-115

Publisher

VILNIUS GEDIMINAS TECH UNIV
DOI: 10.3846/jcem.2018.458

Keywords

precast concrete buildings; ASPO; BIM; IGA

Funding

  1. National Key Research and Development Program of China [2016YFC0701900]
  2. National Natural Science Foundation of China [51378160]

Ask authors/readers for more resources

Due to more complex structure and increasing prefabrication rate of precast concrete buildings, the assembly order between their constituent components is getting more and more attention. In order to solve the assembly sequence planning and optimization (ASPO) problem in precast concrete buildings, Building Information Modelling (BIM) and Improved Genetic Algorithm (IGA) are organically combined to propose a new method called BIM-IGA-based ASPO method. This method uses BIM for parametric modelling, uses IGA to search for an optimal assembly sequence, and then uses BIM again for visual simulation to further test the assembly sequence. Besides, IGA, which is improved in coding mode, crossover operation and mutation operation, is also used to achieve the dynamic adjustment of assembly sequence in construction process. A full-text example is used to explain the detailed operating principle of BIM-IGA-based ASPO method. The results indicate that the method can effectively find an optimal assembly sequence to reduce the assembly difficulty of a precast concrete building.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available