4.7 Article

Dynamic response to demand variability for precast production rescheduling with multiple lines

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 56, Issue 16, Pages 5386-5401

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2017.1414970

Keywords

production rescheduling; precast construction; variability; genetic algorithm; multiple production lines

Funding

  1. Key Technology and Development Program in Shanghai of the Shanghai Commission of Science and Technology [14DZ1207101]

Ask authors/readers for more resources

Production scheduling plays a crucial role in the prefabricated construction productivity and on-time delivery of precast components (PCs). However, previous studies mainly focused on the static scheduling of single production line without considering the demand variability in practice. To achieve dynamic production planning, a Two-level Rescheduling Model for Precast Production with multiple production lines is developed to minimise the rescheduling costs based on genetic algorithm, from the two levels of (1) selection of production line and (2) rescheduling of jobs based on PCs' priority. Further, two scenarios of different and shared mould types are investigated to represent real-world production environments. Finally, a real case study is conducted to test the validity of proposed rescheduling model. 58.1 and 48.5% cost savings are achieved by comparison to no response to changes and heuristic rescheduling methods, respectively. This research contributes to the precast production theory by expanding the insight into dynamic rescheduling with multiple production lines. The methodology will promote the on-time delivery of PCs and enhance the dynamic precast production management.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available