Joint Electricity and Natural Gas Transmission Planning With Endogenous Market Feedbacks

Journal

IEEE TRANSACTIONS ON POWER SYSTEMS
Volume 33, Issue 6, Pages 6397-6409

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2018.2849958

Keywords

AC-OPF; natural gas; convex optimization; second-order cone; elasticity model; gas-price volatility; heat-rate curves

Funding

  1. U.S. National Science Foundation [CMMI-1638331]

Ask authors/readers for more resources

Recent trends in gas-fired power plant installation has increased the connections between the electric power and natural gas industries. Despite these dependencies, both industries must meet commercial, political, operational, and technical requirements that often force the industries to plan and operate in isolation. As a result, undesired situations may arise, such as those experienced by both systems during the winter of 2013/2014 in the northeastern United States. In this paper, we consider the technical challenges and present a Combined Electricity and Gas Expansion (CEGE) planning model. The CEGE model minimizes the cost of meeting gas and electricity demand during high-stress conditions and introduces an elasticity model for analysis of gas-price volatility caused by congestion. The underlying mathematical formulation considers recent advances in convex approximations to make the problem computationally tractable when applied to large-scale CEGE instances. We conduct an in-depth analysis on integrated test systems that include the New England area.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available