Related references
Note: Only part of the references are listed.Cellular Bucket Brigades on U-Lines with Discrete Work Stations
Yun Fong Lim et al.
PRODUCTION AND OPERATIONS MANAGEMENT (2014)
The crane scheduling problem: models and solution approaches
Yongpei Guan et al.
ANNALS OF OPERATIONS RESEARCH (2013)
A Framework for Integrated Berth Allocation and Crane Operations Planning in Seaport Container Terminals
Frank Meisel et al.
TRANSPORTATION SCIENCE (2013)
Robust berth scheduling with uncertain vessel delay and handling time
Ya Xu et al.
ANNALS OF OPERATIONS RESEARCH (2012)
Modeling and solving rich quay crane scheduling problems
Pasquale Legato et al.
COMPUTERS & OPERATIONS RESEARCH (2012)
A self-coordinating bus route to resist bus bunching
John J. Bartholdi et al.
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL (2012)
A unified approach for the evaluation of quay crane scheduling models and algorithms
Frank Meisel et al.
COMPUTERS & OPERATIONS RESEARCH (2011)
Disruption recovery model for berth and quay crane scheduling in container terminals
Qingcheng Zeng et al.
ENGINEERING OPTIMIZATION (2011)
A decision model for berth allocation under uncertainty
Lu Zhen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2011)
Berth and quay crane allocation: a moldable task scheduling model
J. Blazewicz et al.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2011)
The Quay Crane Scheduling Problem with Time Windows
Frank Meisel
NAVAL RESEARCH LOGISTICS (2011)
A bi-objective berth allocation formulation to account for vessel handling time uncertainty
Mihalis M. Golias
MARITIME ECONOMICS & LOGISTICS (2011)
Self-organizing logistics systems
John J. Bartholdi et al.
ANNUAL REVIEWS IN CONTROL (2010)
A survey of berth allocation and quay crane scheduling problems in container terminals
Christian Bierwirth et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
Xiao-le Han et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
Optimality of Affine Policies in Multistage Robust Optimization
Dimitris Bertsimas et al.
MATHEMATICS OF OPERATIONS RESEARCH (2010)
Robust Approximation to Multiperiod Inventory Management
Chuen-Teck See et al.
OPERATIONS RESEARCH (2010)
Simulation-based optimization for discharge/loading operations at a maritime container terminal
Pasquale Legato et al.
OR SPECTRUM (2010)
Robust cyclic berth planning of container vessels
Maarten Hendriks et al.
OR SPECTRUM (2010)
Analysis of berth allocation and inspection operations in a container terminal
Yongpei Guan et al.
MARITIME ECONOMICS & LOGISTICS (2010)
Discrete time model and algorithms for container yard crane scheduling
Wenkai Li et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2009)
Deterministic Chaos in a Model of Discrete Manufacturing
John J. Bartholdi et al.
NAVAL RESEARCH LOGISTICS (2009)
Maximizing Throughput of Bucket Brigades on Discrete Work Stations
Yun Fong Lim et al.
PRODUCTION AND OPERATIONS MANAGEMENT (2009)
Heuristics for the integration of crane productivity in the berth allocation problem
Frank Meisel et al.
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW (2009)
Quay crane scheduling with non-interference constraints in port container terminals
Der-Horng Lee et al.
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW (2008)
The simultaneous berth and quay crane allocation problem
Akio Imai et al.
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW (2008)
A m-parallel crane scheduling problem with a non-crossing constraint
Andrew Lim et al.
NAVAL RESEARCH LOGISTICS (2007)
Crane scheduling with non-crossing constraint
Y. Zhu et al.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2006)
A robust optimization approach to dynamic pricing and inventory control with no backorders
E Adida et al.
MATHEMATICAL PROGRAMMING (2006)
Bucket brigades on in-tree assembly networks
JJ Bartholdi et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
JY Liu et al.
NAVAL RESEARCH LOGISTICS (2006)
A robust optimization approach to inventory theory
D Bertsimas et al.
OPERATIONS RESEARCH (2006)
Recovering cyclic schedules using dynamic produce-up-to policies
DD Eisenstein
OPERATIONS RESEARCH (2005)
Crane scheduling with spatial constraints
A Lim et al.
NAVAL RESEARCH LOGISTICS (2004)
Adjustable robust solutions of uncertain linear programs
A Ben-Tal et al.
MATHEMATICAL PROGRAMMING (2004)
A crane scheduling method for port container terminals
KH Kim et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
Robust discrete optimization and network flows
D Bertsimas et al.
MATHEMATICAL PROGRAMMING (2003)
Performance of bucket brigades when work is stochastic
JJ Bartholdi et al.
OPERATIONS RESEARCH (2001)
Robust solutions of Linear Programming problems contaminated with uncertain data
A Ben-Tal et al.
MATHEMATICAL PROGRAMMING (2000)