4.7 Article

Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components

Journal

AUTOMATION IN CONSTRUCTION
Volume 86, Issue -, Pages 69-80

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/j.autcon.2017.10.026

Keywords

Precast production; On-time delivery; Production costs; Optimization; Simulation; Genetic algorithm

Funding

  1. Key Technology and Development Program in Shanghai of the Shanghai Commission of Science and Technology [14DZ1207101]

Ask authors/readers for more resources

Current precast production scheduling methodologies have limited applicability in practice due to the neglect of real-world production circumstances. To improve, a two-hierarchy simulation-GA hybrid model for precast production (TSGH_PP) is developed to (1) specialize the operations of precast production according to their characteristics, (2) incorporate the uncertainty in processing time in practice, and (3) model the process-waiting time on the flow of work based on the genetic algorithm and discrete event simulation. In the proposed model, the trade-off can be achieved between the conflicting goals of the on-time delivery of precast components and minimum production cost, and the production resources configuration is optimized to cut down resource waste. Finally, a real case study is conducted to test the validity of TSGH_PP approach. The developed model fills the gap in simulation system design and methodology for precast production, and increases the applicability of precast production scheduling methods in real construction projects.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available