4.2 Article

Stability study on the northern batter of MBC Open Pit using Plaxis 3D

Journal

ARABIAN JOURNAL OF GEOSCIENCES
Volume 11, Issue 6, Pages -

Publisher

SPRINGER HEIDELBERG
DOI: 10.1007/s12517-018-3454-1

Keywords

Batter stability; Brown coal; Ground crack; Open pit mining; Rainfall; Buttress

Funding

  1. Maddingley Brown Coal Pty Ltd.
  2. Australian Research Training Program (RTP) Scholarship
  3. Federation University Australia George Collins Memorial Scholarship

Ask authors/readers for more resources

Cracks appeared on the northern batter at Maddingley Brown Coal Open Pit Mine, Victoria, Australia, on 8 November 2013 and a 2-day rainfall event happened 5 days later. This study models the stability of the northern batter considering the effect of the rainfall event and an emergency buttress using finite element method (FEM) encoded in Plaxis 3D. It is found that the batter tended to lead to block sliding after overburden removal. The observed vertical crack would be a combined action of the overburden removal and groundwater flow. The simulated location of cracks agrees well with the actual location, and the simulated heave of the coal seam is in good agreement with the experience in Victoria brown coal open pit mining. The rainfall accelerated the development of the cracks. With the construction of the emergency buttress, the batter became stable that is in good agreement with the monitored data.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.2
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available