Journal
IFAC PAPERSONLINE
Volume 49, Issue 12, Pages 616-621Publisher
ELSEVIER SCIENCE BV
DOI: 10.1016/j.ifacol.2016.07.743
Keywords
closed-loop supply chain; network design; uncertainty; remanufacturing; modal interval; genetic algorithm
Categories
Funding
- National High Technology Research and Development Program [2013AA040206]
- National Key Technology RD Program [2015BAF06B06]
Ask authors/readers for more resources
This paper proposes a modal interval based genetic algorithm to solve the closed-loop supply chain network configuration puzzle under uncertainty. In this special network, the retailer dominates the collection and remanufacturing activities, and sets up dedicate remanufacturing centers to remanufacture the components disassembled from the end of life excavators. This paper applies the modal intervals to characterize the uncertain parameters and combine the modal interval analysis with the genetic algorithm to solve the proposed modal interval linear programming problem. Moreover, three different decision criteria are adopted to analyze the optimal decisions of the remanufacturer. The results confirm that the proposed method can successfully determine the location of different facilities and the allocation of the products and components. (C) 2016, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available