Carbon capture and storage (CCS) will be a critical component of a portfolio of low-carbon energy technologies required to combat climate change (IEA-GHG, 2013). As such, an extensive transportation infrastructure will be required to transport captured CO2 from different sources to the available sinks. Several studies in the literature suggest that shared oversized pipeline networks may be the most efficient long term option compared to single source to sink pipelines, based on increased CCS deployment over the years and therefore increased CO2 flowrate to the transport network. However, what is neglected in this vision is that the deployment of intermittent renewable energy tends to displace thermal power generation. This directly reduces the amount of fossil fuel burned, CO2 produced, captured and transported through the network. This paper presents an optimisation methodology to right-size CO2 transport infrastructure, explicitly accounting for the transient flow of CO2 arising from the co-deployment of intermittent renewable energy generators. By application of this methodology, we demonstrate that capital cost reductions of up to 28% are possible relative to a business-as-usual design case. (C) 2017 Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available