3.8 Article

Optimal PV Location Choice Considering Static and Dynamic Constraints

Publisher

WALTER DE GRUYTER GMBH
DOI: 10.1515/ijeeps-2016-0141

Keywords

critical clearing time; loading margin; optimal location; power loss; PV farm

Ask authors/readers for more resources

A new photovoltaic (PV) farm is proposed to be integrated in GHARDAIA bus distribution network (Gh-17 bus), this paper studies the optimal location of this PV farm in the distribution network. The study is done in IEEE-14 bus then it is validated in Gh-17 bus network, the constraints considered for the choice of the optimal location are the stability margin, power loss and critical clearing time (CCT) in case of line fault. The simulation results are given using the PSAT.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available