Adaptive robust optimization; Complementarity; OR in energy; Transmission expansion; Two-stage
Ask authors/readers for more resources
The work reported in this paper addresses the problem of transmission expansion planning under uncertainty in an electric energy system. We consider different sources of uncertainty, including future demand growth and the availability of generation facilities, which are characterized for different regions within the electric energy system. An adaptive robust optimization model is used to derive the investment decisions that minimizes the system's total costs by anticipating the worst case realization of the uncertain parameters within an uncertainty set. The proposed formulation materializes on a mixed-integer three-level optimization problem whose lower-level problem can be replaced by its KKT optimality conditions. The resulting mixed-integer bilevel model is efficiently solved by decomposition using a cutting plane algorithm. A realistic case study is used to illustrate the working of the proposed technique, and to analyze the relationship between the optimal transmission investment plans, the investment budget and the level of supply security at the different regions of the network. (C) 2014 Elsevier B.V. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available