Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem

Journal

COMPUTERS & INDUSTRIAL ENGINEERING
Volume 107, Issue -, Pages 12-24

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2017.02.019

Keywords

Job shop scheduling; Maximum earliness; Maximum tardiness; Imperialist competitive algorithm; Neighborhood search

Ask authors/readers for more resources

The sum of the maximum earliness and tardiness criteria is a new objective function for the job shop scheduling problem introduced in this work. A mixed integer linear programming (MIP) formulation of the job shop scheduling problem with the new objective function is developed. We design a set of experiments where we validate the MIP model on different problem sizes. This is one of the most difficult problems in combinatorial optimization, with even modest sized instances being computationally intractable. Getting inspiration from a number of advances in solving this notoriously difficult problem, we develop a new approximate optimization approach, which is based on the imperialist competitive algorithm hybridized with an efficient neighborhood search. The effectiveness of the proposed approach is demonstrated through an experimental evaluation. (C) 2017 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available