4.7 Article

Laboratory and field investigation of interlayer bonding between asphalt concrete layer and semi-rigid base constructed by using continuous construction method

Journal

CONSTRUCTION AND BUILDING MATERIALS
Volume 150, Issue -, Pages 418-425

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.conbuildmat.2017.06.011

Keywords

Asphalt concrete layer; Semi-rigid base; Interlayer bonding; Interlock depth; Mechanism of bonding improvement; Continuous construction method

Funding

  1. Department of Transportation of Guangdong Province [2011-02-012]
  2. Huazhong University of Science and Technology [2015QN134]

Ask authors/readers for more resources

In asphalt concrete pavement layered system, interlayer bonding condition has significant effect on its behavior and performance. Bond condition between asphalt layer and semi-rigid base layer is more severe than others because of the different mechanical response under environmental and traffic loading. In this study, continuous construction method (CCM) is proposed to improve the bonding condition by increasing layers interlock depth. As a new construction method, the laboratory testing and field testing are conducted to understand the mechanism of bonding improvement. Quality control methods during the procedures of CCM are proposed. Optimal initial compaction degree of the base layer and paving time interval between base layer and asphalt layer are suggested for better bonding condition. According to the results of field crack survey and deflection testing, CCM can reduce transverse crack number and deflection level with better bonding condition between asphalt layer and semi-rigid base. (C) 2017 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available