4.7 Article

Engineering measures for debris flow hazard mitigation in the Wenchuan earthquake area

Journal

ENGINEERING GEOLOGY
Volume 194, Issue -, Pages 73-85

Publisher

ELSEVIER
DOI: 10.1016/j.enggeo.2014.10.002

Keywords

Debris flow; Engineering measures; Drainage channel; Check dam; Wenchuan earthquake

Funding

  1. Chinese Academy of Sciences [KZZD-EW-05-01]
  2. Key Projects in the National Science and Technology Pillar Program [2011BAK12B03]

Ask authors/readers for more resources

Avalanches and landslides caused by the Wenchuan earthquake in the Longmen Mountains area provide abundant loose solids for debris flows, and a large number of debris flows have occurred during the period 2008-2012. The engineering measures in certain gullies failed, causing serious damage and loss of life. Judging from the debris flow characteristics in the Wenchuan earthquake area, engineering measures should be better constructed after the active period of debris flows in severely affected areas. To reduce debris flow disasters, this paper proposes a mitigation method and design principle based on the transport capacity of the main river. A series of check dams with various opening sizes was designed by investigating and analyzing existing cases. Furthermore, a new type of drainage channel with prefabricated reinforced concrete boxes is proposed. Finally, a case study of the Xiaogangjian Gully, which is a typical debris flow gully in the Wenchuan earthquake area, is presented. This system of engineering measures is based on the main river's transport capacity and consists of five check dams with various opening sizes, a drainage channel with sidewalls constructed of prefabricated reinforced concrete boxes, and a debris flow basin at the base of the main gully. The debris flow mitigation measures constructed in the Xiaogang,jian Gully effectively resisted a debris flow with a 50-year return period that was triggered by rainfall on July 26, 2012. Specifically, these measures effectively protected a highway and minimized debris flow damage. Thus, the layout and engineered structures involved in this new engineering technique can provide a reference design for debris flow hazard mitigation. (C) 2014 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available