4.6 Article

Bicriterion scheduling with group technology and deterioration effect

Journal

JOURNAL OF APPLIED MATHEMATICS AND COMPUTING
Volume 60, Issue 1-2, Pages 455-464

Publisher

SPRINGER HEIDELBERG
DOI: 10.1007/s12190-018-01222-1

Keywords

Scheduling; Group technology; Bicriterion; Deterioration effect

Funding

  1. Foundation of Education Department of Liaoning (China) [L201753]

Ask authors/readers for more resources

This paper studies a single-machine bicriterion scheduling in which both group setup times and job-processing times are deterioration (increasing) functions of their starting times. Two objectives are considered, i.e., the primary criterion is the total weighted completion time, the secondary criterion is the maximum cost. We show that this bicriterion group scheduling problem can be solved in polynomial time.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available