4.6 Article

Consensus Control of Multiple AUVs Recovery System Under Switching Topologies and Time Delays

Journal

IEEE ACCESS
Volume 7, Issue -, Pages 119965-119980

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/ACCESS.2019.2935104

Keywords

Consensus control; multiple AUVs; recovery system; switching topologies; time delays

Funding

  1. National Natural Science Foundation of China [51309067]
  2. Natural Science Foundation of Heilongjiang Province of China [E2016020]
  3. Fundamental Research Funds for the Central Universities [HEUCFP201736, HEUCFM171011]
  4. Student Research and Innovation Fund of the Fundamental Research Funds for the Central Universities [3072019GIP0405]

Ask authors/readers for more resources

The consensus control of multiple AUVs recovery system is the key to complete the multi-AUV recovery mission. This paper proposes consensus control of multiple AUVs recovery system under switching communication topologies and time delays including input delay and communication delay. Consensus control algorithm for a multi-AUV recovery system is assumed to guarantee all the members to reach a common motion state and desired point. The mothership is regarded as the point which all AUVs have to catch up with, the recovery problem of multiple AUVs can be seen as the consensus problem of multi-agents system. A randomly changing consensus stability criteria and stabilization conditions are derived by a suitable Lyapunov-Krasovskii functional for the Markovian switching recovery system with time delays, and then a consensus controller design method is derived. Finally, the correctness of the proposed method is proved by simulation experiments.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available