3.8 Proceedings Paper

Layout configuration, maintenance planning and simulation of AGV based robotic assembly systems

Journal

IFAC PAPERSONLINE
Volume 52, Issue 13, Pages 1626-1631

Publisher

ELSEVIER
DOI: 10.1016/j.ifacol.2019.11.433

Keywords

assembly robots; automated guided vehicles; configuration; genetic algorithm; maintenance engineering; multiobjective optimisations; probabilistic simulation; reliability analysis; scheduling

Funding

  1. European Commission through the H2020 project EPIC [739592]
  2. European Structural and Investment Funds
  3. Hungarian Government [GINOP-2.3.2-15-2016-00002]
  4. Ministry of Human Capacities

Ask authors/readers for more resources

The paper presents a set of modules developed in the Siemens Plant Simulation software, which automatically creates the models of robotic assembly systems with AGV based material handling, and supports the production and maintenance planning The layout planning module creates the layout from a predefined set of components. The area analyser and track configurator modules map the free area in the layout and create the AGV tracks. The maintenance planning module optimises the maintenance schedules of the system. The production control module creates the production schedules and executes an integrated maintenance and production simulation. (C) 2019, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available