4.6 Article

Learning-Based Metaheuristic for Scheduling Unrelated Parallel Machines With Uncertain Setup Times

Journal

IEEE ACCESS
Volume 8, Issue -, Pages 74065-74082

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/ACCESS.2020.2988274

Keywords

Job shop scheduling; Uncertainty; Decision trees; Radio frequency; Estimation; Vegetation; Scheduling; unrelated parallel machines; setup times; random-forest; metaheuristic

Funding

  1. Ministry of Science and Technology, Taiwan, R. O. C. [MOST108-2221-E-027-025]

Ask authors/readers for more resources

Setup time consists of all the activities that need to be completed before the production process takes place. The extant scheduling predominantly relies on simplistic methods, like the average value obtained from historical data, to estimate setup times. However, such methods are incapable of representing the real industry situation, especially when the setup time is subject to significant uncertainties. In this situation, the estimation error increases proportionally to the problem size. This study proposes a Random-Forest-based metaheuristic to minimize the makespan in an Unrelated Parallel Machines Scheduling Problem (UPMSP) with uncertain machine-dependent and job sequence-dependent setup times (MDJSDSTs). Taking the forging industry as an example, the numerical experiments show that the error percentage for the setup time estimation substantially decreases when the proposed approach is applied. This improvement is particularly significant when large-scale problems are sought. Overall, this study highlights the role of advanced analytics in bridging the gap between scheduling theory and practice.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available