Development of a conceptual model for evaluating the success of BIM-based construction projects

Journal

SMART AND SUSTAINABLE BUILT ENVIRONMENT
Volume 10, Issue 4, Pages 681-701

Publisher

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/SASBE-02-2020-0013

Keywords

BIM-Based construction projects; BIM; Project success; BIM impacts; BIM effectiveness

Funding

  1. University of Cape Town (UCT)
  2. National Research Foundation

Ask authors/readers for more resources

The study proposes a conceptual model for evaluating the success of BBCPs by extracting eight success criteria and categorizing them based on the impact of BIM across four levels of project application. The findings suggest that the success of a BBCP is related to the extent of BIM application and an increase in success criteria is linked to the effectiveness of BIM, rather than its impact. This research is important for developing a model to assess the success of BIM-based construction projects.
Purpose Research into project success (PS) has a long pedigree as has research into the impact of building information modelling (BIM) on projects. Yet, despite the many revealed advantages BIM is known to deliver to projects, the relationship between the level of BIM application within a project, BIM's ability to impact a project at that level and the consequent effectiveness and range of success factors BIM is able to bestow across levels remains unmapped. Given the importance of evaluating the success of BIM-based construction projects (BBCPs) and the necessity to ensure the continual improvement of the BIM process, there is a need to identify the relationship between the level of BIM employed on a project and the specific PS factors that BIM is able to impact at that level. Design/methodology/approach This study puts forward a conceptual model for evaluating the success of BBCPs. A thematic synthesis approach is taken, using Scopus and other databases, and retrieving relevant articles from some 50 journals. Findings Eight success criteria for BBCPs were extracted and categorised according to BIM's ability to impact them across four levels of project application. Mapping BIM's variable impact at these four levels against the eight success factors produces a model for evaluating the PS of BBCPs. The model posits that the success of a BBCP is a function of the extent to which BIM is applied to the project. Moreover, the findings indicate that an increase in the number of PS criteria (PSC) for a BBCP is a derivative of BIM effectiveness, and not BIM impact. Originality/value This work constitutes seminal research to examine the concept of PS and PSC for BBCPs with the view to developing a model for evaluating the PS of BBCPs.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available