Integrated Optimal Siting and Sizing for VSC-HVDC-link-based Offshore Wind Farms and Shunt Capacitors

Journal

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.35833/MPCE.2018.000538

Keywords

Capacitors; HVDC transmission; Planning; Wind farms; Investment; Reactive power; Maintenance engineering; Capacitor; installed capacity; point of common coupling (PCC); offshore wind farm (OWF); voltage-source converter high-voltage direct current (VSC-HVDC) link

Funding

  1. National Key Research and Development Program of China [2016YFB0900100]
  2. National Natural Science Foundation of China [51707059]
  3. 111 Project of China [B17016]
  4. Excellent Innovation Youth Program of Changsha of China [KQ1802029]

Ask authors/readers for more resources

This study proposes an integrated planning model for OWFs integrated into the AC system through VSC-HVDC links, aiming to optimize the siting and sizing of OWFs, improve the voltage profile, and reduce the adverse influence of reactive power, thus minimizing total investment costs, operation costs, and maintenance costs.
It is economic and secure to determine the optimal siting and sizing of the offshore wind farms (OWFs) integrated into the AC system through voltage-source converter high-voltage direct current (VSC-HVDC) links. In this paper, an integrated planning model for the VSC-HVDC-link-based OWFs and the capacitors is proposed, where a decomposition technique is presented to solve the proposed mixed-integer nonlinear programming (MINLP) problem and obtain the optimal solution. This model can optimize the siting and sizing of the OWFs to improve the voltage profile and reduce the adverse influence of the reactive power of the OWFs. With the proposed planning model, the total investment costs, operation costs and maintenance costs of the OWFs, VSC-HVDC links, and the capacitors can be minimized. Simulations on the modified IEEE 118-bus system show that the proposed integrated planning model can provide more economic scheme than the independent planning scheme, in which the capacitors are planned after the OWFs. Besides, a series of sensitivity analysis on certain equipment costs are studied to obtain the regular pattern for sizing VSC stations.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available