3.9 Article

Impacts of 4D BIM on construction project performance

Journal

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT
Volume 21, Issue 7, Pages 724-737

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/15623599.2019.1580832

Keywords

Project performance; 4D BIM; project schedule; project reliability; project diagnostics

Categories

Ask authors/readers for more resources

This study investigated the impacts of 4D building information modeling (BIM) on construction projects and found significant benefits in terms of project reliability, monitoring, and diagnosis. However, issues such as lack of shared responsibility, limited understanding and training regarding 4D BIM, and complexity in effective implementation were also highlighted.
A significant proportion of construction projects are failing to achieve their deadline finish dates. This advocate for solutions that could address the root causes of time impacting risks, leading to the use of 4D building information modeling (BIM) for project planning. This study investigates the impacts of 4D BIM on construction projects. An exploratory sequential mixed method research was conducted to initially explore the topic via interviews and literature review, and, subsequently, the themes derived were put into questionnaires to elicit expert knowledge on a wider industry scale. The data were analyzed using thematic analysis, reliability analysis, Kruskal-Wallis test and factor analysis. Across the objectives around the impacts of 4D BIM on project reliability, monitoring and diagnosis, the findings presented eight key ways the 4D BIM support project performance. Examples of component factors that were raised was planning efficiency to enhance planner output, assessment and directive with a better comparison of planned and actual progress, and thorough/comprehensive risk reflection to cover wide ranges of issues. Upon further reflection, the finding highlighted the issues of the lack of shared responsibility outside of the planner and BIM coordinator, severe lack of understanding and training regarding 4D BIM and complexity of carrying out the process effectively.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.9
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available