Removal of acetaminophen from wastewater by constructed wetlands with Scirpus validus

Journal

ENVIRONMENTAL ENGINEERING RESEARCH
Volume 21, Issue 2, Pages 164-170

Publisher

KOREAN SOC ENVIRONMENTAL ENGINEERS
DOI: 10.4491/eer.2015.132

Keywords

Acetaminophen; Constructed wetland; Fenton reaction; Pharmaceuticals and personal care products; Wastewater

Funding

  1. Korea Institute of Science and Technology (KIST), Republic of Korea

Ask authors/readers for more resources

Since most of the existing wastewater treatment options lack the ability to treat micro-contaminants, the increased use of pharmaceuticals and personal care products (PPCPs) and release as human waste have become a serious concern in recent years. Constructed wetlands (CWs) are a low-cost technology for wastewater treatment, however, its performance in term of PPCPs removal has not yet been fully investigated. This study aimed to characterize the removal factors and efficiency of acetaminophen (ACT) removal by CWs. The results revealed the decreased concentrations of ACT with increasing hydraulic retention times (HRT) of 0, 3, 5 days. The contribution of removal factors was found to be varied with initial ACT concentration. At the low ACT concentration (i.e. 1 ppb), plant uptake was the dominant, followed by microbial and photolytic removal. In contrast, at the high ACT concentration (i.e. 100 ppb), microbial and photolytic removal were found as dominant factors. On the other hand, hydrogen peroxide (H2O2) concentration was found at higher level in the plant shoot than in the root probably due to occurrence of the Fenton reaction resulting in PPCPs removal.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available