This study provides a preliminary techno-economic analysis of concentrated solar power (CSP) plants with sCO2 power blocks. It compares different cycle configurations and identifies the recompressed cycle with intercooling as the most promising configuration in terms of efficiency and investment cost. The study also highlights the impact of turbomachinery isentropic efficiencies on the techno-economic analysis and presents the cost breakdown of the sCO2 power block.
Concentrating solar power (CSP) plants, thanks to the implementation of cost-competitive thermal energy storage, represent a dispatchable zero-emission alternative to traditional fossil fuel power plants. Next generation solar towers are expected to adopt high temperature receivers (>700 degrees C) coupled to sCO(2)-based power blocks, which optimal design is generally pushed towards the maximum cycle efficiency, often neglecting the economic impact with the justification that the main share of the capital cost is represented by the heliostat field. As result, the scientific literature lacks in comprehensive studies on techno-economic evaluation of CSP+sCO(2) power plants addressing the important correlation that exists between system cost and performances. This work provides a preliminary techno-economic analysis of a solar power tower comparing four different cycle configurations for the sCO(2) power block. Results have been reported on a Pareto front, highlighting the tradeoff between the plant investment cost and the solar-to-electricity plant efficiency. The trends of the optimization variables and cycle results have been reported to give useful insights about proper assumptions for the sCO(2) power block design. The recompressed cycle with intercooling resulted as the most promising configuration and it has been further analyzed through a comparison of different solutions on the Pareto front. The cost breakdown of the sCO(2) power block has been reported to highlight which components have the greatest impact on the overall plant cost and how they vary along the optimal solutions front. Eventually, the optimization has been repeated introducing a correlation to compute the turbomachinery isentropic efficiencies, to investigate their effect on the techno-economic analysis.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

3.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available