4.5 Article

Causes of delay in offshore wind turbine construction projects

Related references

Note: Only part of the references are listed.
Article Engineering, Industrial

Overall Construction Productivity: a new lean metric to identify construction losses and analyse their causes in Engineer-to-Order construction supply chains

Marcello Braglia et al.

Summary: Construction projects often face supply chain integration issues due to their uniqueness and one-time nature, leading to on-site problems and delays. This study proposes a framework and metric to identify losses and causes, quantify the overall impact, and support the implementation of improvement actions.

PRODUCTION PLANNING & CONTROL (2022)

Article Engineering, Industrial

Learning to see value-adding and non-value-adding work time in renovation production systems

Hasse Neve et al.

Summary: This study used the work sampling method to collect data from three renovation construction production systems and analyzed the usage of time. The findings showed that value-adding work accounted for about 29.5% of the total time in renovation projects. The study also revealed the behaviors of both value-adding and non-value-adding work, providing insights for future research.

PRODUCTION PLANNING & CONTROL (2022)

Article Management

Ranking and comparing key factors causing time-overruns in on-site construction

Soren M. Lindhard et al.

Summary: The construction industry has been trying to find ways to avoid time-overruns in construction. Site-managers have difficulties in reducing time-overruns despite previous research. This study investigates resource related factors and ranks them based on their likelihood of causing delay. The study found that construction design and connecting works are the most common factors causing time-overruns, suggesting that site-managers should focus on avoiding these factors.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2022)

Review Management

Causes of delay in the global construction industry: a meta analytical review

Muizz O. Sanni-Anibire et al.

Summary: The construction industry is plagued by inefficiency and productivity losses, including delays. The impact of delays can result in time and cost overruns, legal disputes, and project abandonment. Despite the increasing trend of construction globalization, there is a lack of systematic review on research about construction delays. This study provides an overview of the causes of construction delays and conducts a meta-data analysis based on Relative Importance Index (RII) values from influential studies in the past 15 years. Based on this analysis, the top five causes of delays globally are identified as contractor's financial difficulties, delay in approval of completed work, slow delivery of materials, poor site organization and coordination, and poor planning of resources and duration estimation/scheduling.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2022)

Article Management

Critical delay factors in power transmission projects: a structural equation modeling approach

Goutom K. Pall et al.

Summary: This study develops a model to understand and identify the causes of delays in power transmission projects. It introduces sector-specific and general factors as the most critical factors in project delays. The findings are expected to have a significant influence on professionals in minimizing time overruns in power transmission and other linear projects.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2022)

Review Engineering, Industrial

Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives

Patrick Dallasega et al.

Summary: Various methodologies have been introduced for production planning and control in the construction industry, but they are difficult to apply in practice. The study found that these methodologies offer limited support for real-time assessment of construction progress and project status. A classification of strengths and shortcomings was proposed to assist practitioners in decision-making.

PRODUCTION PLANNING & CONTROL (2021)

Article Construction & Building Technology

Duration and Cost Variability of Construction Activities: An Empirical Study

P. Ballesteros-Perez et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2020)

Article Engineering, Industrial

Assessment of delay factors in construction of sport facilities through multi criteria decision making

Murat Gunduz et al.

PRODUCTION PLANNING & CONTROL (2020)

Article Engineering, Industrial

Critical overrun causations in marine projects

Hamidreza Karami et al.

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2020)

Article Construction & Building Technology

Application of Last Planner System to Modular Offshore Wind Construction

Jon Lerche et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2020)

Article Management

Time and cost overruns in the UAE construction industry: a critical analysis

Reshma Mary Johnson et al.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2020)

Article Management

Development of a scale for factors causing delays in infrastructure projects in India

J. C. Edison et al.

CONSTRUCTION ECONOMICS AND BUILDING (2020)

Review Green & Sustainable Science & Technology

Current trend in offshore wind energy sector and material requirements for fatigue resistance improvement in large wind turbine support structures - A review

Victor Igwemezie et al.

RENEWABLE & SUSTAINABLE ENERGY REVIEWS (2019)

Review Green & Sustainable Science & Technology

Examining the trends of 35 years growth of key wind turbine components

Peter Enevoldsen et al.

ENERGY FOR SUSTAINABLE DEVELOPMENT (2019)

Article Engineering, Marine

Fuzzy Bayesian schedule risk network for offshore wind turbine installation

Min-Yuan Cheng et al.

OCEAN ENGINEERING (2019)

Review Management

Critical risk factors in the application of modular integrated construction: a systematic review

Ibrahim Y. Wuni et al.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2019)

Article Management

Risk factors in oil and gas construction projects in developing countries: a case study

Mukhtar A. Kassem et al.

INTERNATIONAL JOURNAL OF ENERGY SECTOR MANAGEMENT (2019)

Review Business

Causes of delays on construction projects: a comprehensive list

Serdar Durdyev et al.

INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS (2019)

Review Green & Sustainable Science & Technology

Offshore wind installation: Analysing the evidence behind improvements in installation time

Roberto Lacal-Arantegui et al.

RENEWABLE & SUSTAINABLE ENERGY REVIEWS (2018)

Article Management

Causes of claims in road construction projects in the UAE

Malek Mishmish et al.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2018)

Article Business

The top 10 universal delay factors in construction projects

Youcef J. -T. Zidane et al.

INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS (2018)

Article Business

Categorizing modularization strategies to achieve various objectives of building investments

Antti Peltokorpi et al.

CONSTRUCTION MANAGEMENT AND ECONOMICS (2018)

Article Energy & Fuels

Cost performance and risk in the construction of offshore and onshore wind farms

Benjamin K. Sovacool et al.

WIND ENERGY (2017)

Article Business, Finance

The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman

Adekunle Sabitu Oyegoke et al.

JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION (2017)

Article Construction & Building Technology

Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims

Pablo Ballesteros-Perez et al.

AUTOMATION IN CONSTRUCTION (2017)

Article Computer Science, Interdisciplinary Applications

Bi-objective optimisation model for installation scheduling in offshore wind farms

Chandra Ade Irawan et al.

COMPUTERS & OPERATIONS RESEARCH (2017)

Article Green & Sustainable Science & Technology

Minimizing transportation and installation costs for turbines in offshore wind farms

Bhaba R. Sarker et al.

RENEWABLE ENERGY (2017)

Article Green & Sustainable Science & Technology

Do onshore and offshore wind farm development patterns differ?

Peter Enevoldsen et al.

ENERGY FOR SUSTAINABLE DEVELOPMENT (2016)

Article Green & Sustainable Science & Technology

Assessment approaches to logistics for offshore wind energy installation

Iris F. A. Vis et al.

SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS (2016)

Article Construction & Building Technology

Standardization Strategy for Modular Industrial Plants

James T. O'Connor et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2015)

Article Engineering, Industrial

Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects

Murat Gunduz et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2015)

Article Engineering, Industrial

Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study

Mohammed Ruqaishi et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2015)

Review Green & Sustainable Science & Technology

Trends of offshore wind projects

S. Rodrigues et al.

RENEWABLE & SUSTAINABLE ENERGY REVIEWS (2015)

Article Construction & Building Technology

Standardization Strategy for Modular Industrial Plants

James T. O'Connor et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2015)

Article Engineering, Industrial

Climate and construction delays: case study in Chile

Pablo Ballesteros-Perez et al.

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2015)

Article Business

Analysing delay causes and effects in Ghanaian state housing construction projects

Charles Teye Amoatey et al.

INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS (2015)

Article Construction & Building Technology

Root-Cause Analysis of Construction-Cost Overruns

Yehiel Rosenfeld

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2014)

Article Management

Exploration of the reasons for delays in construction

Soren Lindhard et al.

INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2014)

Article Engineering, Industrial

Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey

Murat Gunduz et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2013)

Article Construction & Building Technology

Factors Affecting Construction Labor Productivity in Kuwait

Abdulaziz M. Jarkas et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2012)

Article Engineering, Industrial

Causes of Delay in Road Construction Projects

Ibrahim Mahamid et al.

JOURNAL OF MANAGEMENT IN ENGINEERING (2012)

Article Business

Contested overruns and performance of offshore wind power plants

Christian Koch

CONSTRUCTION MANAGEMENT AND ECONOMICS (2012)

Article Management

Analysing factors affecting delays in Indian construction projects

Hemanta Doloi et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2012)

Proceedings Paper Construction & Building Technology

Cause of Construction Delay - Theoretical Framework

N. Hamzah et al.

2ND INTERNATIONAL BUILDING CONTROL CONFERENCE (2011)

Article Management

Taxonomy for change causes and effects in construction projects

Ming Sun et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2009)

Article Management

Cost escalation and schedule delays in road construction projects in Zambia

Chabota Kaliba et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2009)

Article Management

Quantifying schedule risk in construction projects using Bayesian belief networks

Van Truong Luu et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2009)

Article Business

WHAT PASSES AS A RIGOROUS CASE STUDY?

Michael Gibbert et al.

STRATEGIC MANAGEMENT JOURNAL (2008)

Article Business

Problems causing delays in major construction projects in Thailand

Shamas-Ur-Rehman Toor et al.

CONSTRUCTION MANAGEMENT AND ECONOMICS (2008)

Article Engineering, Industrial

The significant factors causing delay of building construction projects in Malaysia

Wa'el Alaghbari et al.

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2007)

Article Construction & Building Technology

Construction delays and their causative factors in Nigeria

Ajibade Ayodeji Aibinu et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2006)

Article Construction & Building Technology

Construction delays in Hong Kong civil engineering projects

Tommy Y. Lo et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2006)

Article Business

Significant factors causing delay in the UAE construction industry

Arshi Shakeel Faridi et al.

CONSTRUCTION MANAGEMENT AND ECONOMICS (2006)

Article Business

Delays and cost increases in the construction of private residential projects in Kuwait

P. A. Koushki et al.

CONSTRUCTION MANAGEMENT AND ECONOMICS (2005)