Related references
Note: Only part of the references are listed.Human-robot collaborative disassembly line balancing considering the safe strategy in remanufacturing
Wenjun Xu et al.
JOURNAL OF CLEANER PRODUCTION (2021)
An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company
S. Mohammadi et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2020)
Collaborative optimization of robotic disassembly sequence planning and robotic disassembly line balancing problem using improved discrete Bees algorithm in remanufacturing
Jiayi Liu et al.
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING (2020)
Integrated Production and Distribution Problem of Perishable Products with a Minimum Total Order Weighted Delivery Time
Ling Liu et al.
MATHEMATICS (2020)
Service Platform for Robotic Disassembly Planning in Remanufacturing
Jiayi Liu et al.
JOURNAL OF MANUFACTURING SYSTEMS (2020)
An Integrated Optimal Design for Guaranteed Cost Control of Motor Driving System With Uncertainty
Tianyi Zeng et al.
IEEE-ASME TRANSACTIONS ON MECHATRONICS (2019)
Digital twin-driven product design, manufacturing and service with big data
Fei Tao et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2018)
Integrated Order Scheduling and Packing
Zhi-Long Chen et al.
PRODUCTION AND OPERATIONS MANAGEMENT (2009)
Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
G Pundoor et al.
NAVAL RESEARCH LOGISTICS (2005)
Supply chain scheduling: Batching and delivery
NG Hall et al.
OPERATIONS RESEARCH (2003)