This study focused on dam breach modeling and downstream flood inundation mapping. ArcGIS and HEC-RAS tools were used for model development, breach simulation, unsteady flood routing, and estimation of breach parameters, resulting in important hydrological data for flood analysis.
This study was, therefore, taken up to dam breach modeling and downstream flood inundation mapping. To achieve this objective, the software ArcGIS Version 10.4 extension program of HEC-GeoRAS Version 10 tool was used for HEC-RAS model development, to generate modeling reach and floodplain cross-sectional geometric data and for downstream inundation mapping and HEC-RAS Version 6.3.1 tool was used for subject dam break simulation and unsteady flood routing at downstream regions. Von Thun and Gillette regression equation was selected to estimate the breach parameter and the result shows that breach bottom width is 113 m, side slope 0.5H : 1V and breach development time is 0.85 hr for overtopping and bottom width is 111 m, and side slope 0.5H : 1V and breach development time is 0.83 hr for pipping. During analysis of flood routing the peak discharge at the dam site is 19,753.68 m3/s occurred at 4 hr for overtopping and 25,128.1 m3/s at time to peak 4 hr for pipping.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available