Related references
Note: Only part of the references are listed.System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study
Zain Ghazi Al-Kofahi et al.
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT (2022)
Feasibility Analysis of COVID-19 Response Guidelines at Construction Sites in South Korea Using CYCLONE in Terms of Cost and Time
Sungchul Kim et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2021)
Knowledge Sharing and Productivity Improvement: An Agent-Based Modeling Approach
Daoud Kiomjian et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2020)
Development of Cost and Schedule Data Integration Algorithm Based on Big Data Technology
Daegu Cho et al.
APPLIED SCIENCES-BASEL (2020)
Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach
Chengke Wu et al.
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2019)
Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project
Behzad Mahjoubpour et al.
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2018)
AN EXPERT SYSTEM TO OPTIMIZE COST AND SCHEDULE OF HEAVY EARTHMOVING OPERATIONS FOR EARTH- AND ROCK-FILLED DAM PROJECTS
Nizar Markiz et al.
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT (2017)
Agent-Based Modeling and Simulation
Franziska Klügl et al.
AI MAGAZINE (2017)
Construction labor productivity convergence: a conditional frontier approach
Le Ma et al.
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2016)
Lean and agile integration within offsite construction using discrete event simulation A systematic literature review
Sherif Mostafa et al.
CONSTRUCTION INNOVATION-ENGLAND (2016)
Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity
Gholamreza Heravi et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2015)
Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity
Gholamreza Heravi et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2015)
Construction and evaluation framework for a real-life project database
Jordy Batselier et al.
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2015)
Implementation of Construction Performance Database Prototype for Curtain Wall Operation in High-Rise Building Construction
Seungwoo Han et al.
JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING (2014)
A framework for an automated and integrated project scheduling and management system
Shih-Ming Chen et al.
AUTOMATION IN CONSTRUCTION (2013)
Database Framework for Cost, Schedule, and Performance Data Integration
Daegu Cho et al.
JOURNAL OF COMPUTING IN CIVIL ENGINEERING (2013)
Simulation and analytical techniques for construction resource planning and scheduling
Shih-Ming Chen et al.
AUTOMATION IN CONSTRUCTION (2012)
Off-Site Construction Planning Using Discrete Event Simulation
Amin Alvanchi et al.
JOURNAL OF ARCHITECTURAL ENGINEERING (2012)
A framework for an automated and integrated project monitoring and control system for steel fabrication projects
Reza Azimi et al.
AUTOMATION IN CONSTRUCTION (2011)
Predicting construction crew productivity by using Self Organizing Maps
Emel Laptali Oral et al.
AUTOMATION IN CONSTRUCTION (2010)
Role of Simulation in Construction Engineering and Management
Simaan AbouRizk
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2010)
Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management
Julio C. Martinez
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2010)
Assessing the impact of materials tracking technologies on construction craft productivity
David Grau et al.
AUTOMATION IN CONSTRUCTION (2009)
Production prediction of conventional and global positioning system-based earthmoving systems using simulation and multiple regression analysis
Seungwoo Han et al.
CANADIAN JOURNAL OF CIVIL ENGINEERING (2008)
Simplified discrete-event simulation approach for construction simulation
M Lu
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2003)