Note: Only part of the references are listed.Performing a multi-unit level-3 PSA with MACCS
Nathan E. Bixler et al.
NUCLEAR ENGINEERING AND TECHNOLOGY (2021)
Development of an evaluation method for planning of urgent protection strategies in a nuclear emergency using a level 3 probabilistic risk assessment
Masanori Kimura et al.
JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY (2021)
Study on multi-unit level 3 PSA to understand a characteristics of risk in a multi-unit context
Kyemin Oh et al.
NUCLEAR ENGINEERING AND TECHNOLOGY (2020)
SOARCA uncertainty analysis of a short-term station blackout accident at the Sequoyah nuclear power plant
N. E. Bixler et al.
ANNALS OF NUCLEAR ENERGY (2020)
An algorithm for enhancing spatiotemporal resolution of probabilistic risk assessment to address emergent safety concerns in nuclear power plants
Ha Bui et al.
RELIABILITY ENGINEERING & SYSTEM SAFETY (2019)
GIS-Based Integration of Social Vulnerability and Level 3 Probabilistic Risk Assessment to Advance Emergency Preparedness, Planning, and Response for Severe Nuclear Power Plant Accidents
Justin Pence et al.
RISK ANALYSIS (2019)
Methodological and Practical Comparison of Integrated Probabilistic Risk Assessment (I-PRA) with the Existing Fire PRA of Nuclear Power Plants
Tatsuya Sakurahara et al.
NUCLEAR TECHNOLOGY (2018)
Hybrid Multimodal and Intermodal Transport Simulation Case Study on Large-Scale Evacuation Planning
Gregor Laemmel et al.
TRANSPORTATION RESEARCH RECORD (2016)