4.5 Article

Integration of Level 3 probabilistic risk assessment for nuclear power plants with transportation simulation considering earthquake hazards

Journal

ANNALS OF NUCLEAR ENERGY
Volume 197, Issue -, Pages -

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.anucene.2023.110243

Keywords

Nuclear power plant; Level 3 Probabilistic Risk Assessment; Agent-based Transportation Simulation; Evacuation; Earthquake

Ask authors/readers for more resources

This research improves the realism of Level 3 probabilistic risk assessment for nuclear power plants by modeling the evacuation behavior of residents and incorporating two advancements. The first advancement uses evacuation speed from a transportation simulation code as input to the Level 3 PRA code, enabling explicit incorporation of spatiotemporal evacuation processes. The second advancement incorporates the probability of seismic damage to roadway bridges into Level 3 PRA and calculates evacuation routes and speeds considering the impact of seismic damage.
This research improves the realism of Level 3 probabilistic risk assessment (PRA) for nuclear power plants (NPPs) to avoid subjective expert judgement by modeling the evacuation behavior of the residents and making two advancements. First, evacuation speed taken from a transportation simulation code was used as an input to the Level 3 PRA code, i.e., the MELCOR Accident Consequence Code System (MACCS). The transportation simulation code uses the Multiagent Transport Simulation (MATSim) evacuation extension software. MATSim is interfaced with MACCS, by generating input-output communication through evacuation routes and speed distributions. Integrating the agent-based transportation simulation with the Level 3 PRA code enables the explicit incorpo-ration of spatiotemporal evacuation processes into NPP offsite risk assessment. Second, this research is the first to explicitly incorporate the probability of seismic damage to roadway bridges into Level 3 PRA of NPPs. The likelihood of seismic bridge damage, given an earthquake, is estimated using the HAZUS program developed by the Federal Emergency Management Agency (FEMA). The road closure due to seismic damage, estimated by HAZUS, is used as input to the agent-based transportation simulation, where evacuation routes and speed dis-tributions are calculated considering the impact of seismic damage. These advancements can improve the realism of Level 3 PRA for NPPs by enhancing the evacuation analysis resolution and reducing the reliance on subjective judgment to characterize evacuation routes, speed, and seismic impact on Level 3 PRA. Integrating the trans-portation simulation and the natural hazard risk assessment with the Level 3 PRA code can also provide more in-depth causal insights for offsite risk management, such as recommending optimal evacuation routes in an emergency response plan. These contributions are demonstrated using the Sequoyah NPP case study adopted from the state-of-the-art reactor consequence analyses (SOARCA) conducted by the U.S. Nuclear Regulatory Commission (NRC).

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available